Same-Day Shipping
Machrio
9W LED Ground Spike Flood Light 125mm Dia Warm White for Tree, Pkg Qty 2

Hover to zoom

Industrial · SKU: AE4276275

9W LED Ground Spike Flood Light 125mm Dia Warm White for Tree, Pkg Qty 2

This 9W LED ground spike floodlight delivers efficient warm white illumination specifically engineered for landscape and tree uplighting applications. The unit features a compact cylindrical design measuring 4.9 inches in diameter by 13.4 inches in height, ensuring discreet installation within garden beds. Constructed for durability, it operates reliably across a wide voltage range of 85 to 265V AC, accommodating diverse electrical infrastructures. The integrated spike mount facilitates rapid deployment without complex mounting hardware, providing a robust lighting solution for commercial exterior environments that requires minimal maintenance while maintaining consistent optical performance.

Contact for Availability
$49.99
$25.00/each(2 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$49.99
11 - 50-5%$47.49
51+-10%$44.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

Wattage9W
Color TemperatureWarm White
Lumens810 lm
Voltage85-265V AC
Beam Angle120 deg
IP RatingIP65

Related Products

8 products

Frequently Asked Questions

What are the key specifications of 9W LED Ground Spike Flood Light 125mm Dia Warm White for Tree, Pkg Qty 2?
Full specifications for 9W LED Ground Spike Flood Light 125mm Dia Warm White for Tree, Pkg Qty 2 are listed in the specification table on this page. This product is in the Floodlights category.
What is the minimum order quantity and bulk pricing for 9W LED Ground Spike Flood Light 125mm Dia Warm White for Tree, Pkg Qty 2?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for 9W LED Ground Spike Flood Light 125mm Dia Warm White for Tree, Pkg Qty 2?
Contact us for current availability. Estimated lead time: 2-3 weeks.