Same-Day Shipping
Machrio
Steel EMC Rivet Mounting Shielding Clip 0.12-0.47 in for Grounding, Pkg Qty 36

Hover to zoom

Industrial · SKU: AE7317672

Steel EMC Rivet Mounting Shielding Clip 0.12-0.47 in for Grounding, Pkg Qty 36

This steel EMC rivet mounting shielding clip provides reliable grounding connectivity for rods with diameters ranging from 0.12 to 0.47 inches. Engineered for durable performance, the unit features a robust steel construction designed to meet established industry standards for electromagnetic compatibility and electrical safety. The rivet-mount design ensures secure, permanent installation without requiring specialized welding equipment. Supplied in packages of 36, these clips offer an efficient solution for integrating shielding systems in industrial applications where consistent ground bonding is critical.

Contact for Availability
$89.99
$2.50/each(36 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$89.99
11 - 50-5%$85.49
51+-10%$80.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

Voltage RatingNot Applicable
Current RatingNot Applicable
MaterialSteel
Rod LengthNot Applicable
Rod Diameter0.12-0.47 in
StandardsMeets Industry Standards

Related Products

8 products

Frequently Asked Questions

What are the key specifications of Steel EMC Rivet Mounting Shielding Clip 0.12-0.47 in for Grounding, Pkg Qty 36?
Full specifications for Steel EMC Rivet Mounting Shielding Clip 0.12-0.47 in for Grounding, Pkg Qty 36 are listed in the specification table on this page. This product is in the Grounding Rods category.
What is the minimum order quantity and bulk pricing for Steel EMC Rivet Mounting Shielding Clip 0.12-0.47 in for Grounding, Pkg Qty 36?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for Steel EMC Rivet Mounting Shielding Clip 0.12-0.47 in for Grounding, Pkg Qty 36?
Contact us for current availability. Estimated lead time: 2-3 weeks.