Same-Day Shipping
Machrio
Metal Limit Switch 600V 10A Lever Actuator for Industrial Control, Pkg Qty 2

Hover to zoom

Industrial · SKU: AA5700170

Metal Limit Switch 600V 10A Lever Actuator for Industrial Control, Pkg Qty 2

This industrial-grade metal limit switch features a robust construction designed for demanding control applications, rated for 600 V and 10 A. The unit incorporates a durable lever actuator for precise mechanical positioning and reliable signal transmission in heavy machinery environments. Housed in a protective metal enclosure with PG21 cable entry compatibility, it ensures long-term operational stability against physical impact and environmental contaminants. Ideal for safety interlocks and travel limiting, this component delivers consistent performance within standard industrial voltage ranges while maintaining a compact footprint for versatile panel integration.

Contact for Availability
$49.99
$25.00/each(2 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$49.99
11 - 50-5%$47.49
51+-10%$44.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

Voltage Rating600 V
Current Rating10 A
MaterialMetal
Switch TypeLimit Switch
Actuator TypeLever
Voltage600 V

Related Products

8 products

Frequently Asked Questions

What are the key specifications of Metal Limit Switch 600V 10A Lever Actuator for Industrial Control, Pkg Qty 2?
Full specifications for Metal Limit Switch 600V 10A Lever Actuator for Industrial Control, Pkg Qty 2 are listed in the specification table on this page. This product is in the Limit Switches category.
What is the minimum order quantity and bulk pricing for Metal Limit Switch 600V 10A Lever Actuator for Industrial Control, Pkg Qty 2?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for Metal Limit Switch 600V 10A Lever Actuator for Industrial Control, Pkg Qty 2?
Contact us for current availability. Estimated lead time: 2-3 weeks.