Same-Day Shipping
Machrio
Carbon Steel M1.5 End Plate for D-JPT 1.5/S Terminal Blocks, Pkg Qty 100

Hover to zoom

Industrial · SKU: AC3894968

Carbon Steel M1.5 End Plate for D-JPT 1.5/S Terminal Blocks, Pkg Qty 100

Designed for industrial electrical assemblies, this carbon steel end plate provides robust termination for D-JPT 1.5/S terminal block systems. Manufactured from high-grade steel without surface coatings, the component ensures maximum conductivity and structural integrity in demanding environments. Engineered to secure M1.5 (approx. 0.059 inches) thread configurations, it delivers reliable mechanical stability for panel-mounted applications. Supplied in bulk packages of 100 units, these uncoated plates offer a cost-effective solution for large-scale infrastructure projects requiring durable, bare metal components compatible with standard 1.5mm pitch terminal arrangements.

Contact for Availability
$29.99
$0.30/each(100 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$29.99
11 - 50-5%$28.49
51+-10%$26.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

System of MeasurementMetric
Material Grade/ClassCarbon Steel
MaterialSteel
Thread SizeM1.5
FinishNone
LengthUnknown
Head TypeEnd Plate
Drive TypeNone

Related Products

8 products

Frequently Asked Questions

What are the key specifications of Carbon Steel M1.5 End Plate for D-JPT 1.5/S Terminal Blocks, Pkg Qty 100?
Full specifications for Carbon Steel M1.5 End Plate for D-JPT 1.5/S Terminal Blocks, Pkg Qty 100 are listed in the specification table on this page. This product is in the Machine Screws category.
What is the minimum order quantity and bulk pricing for Carbon Steel M1.5 End Plate for D-JPT 1.5/S Terminal Blocks, Pkg Qty 100?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for Carbon Steel M1.5 End Plate for D-JPT 1.5/S Terminal Blocks, Pkg Qty 100?
Contact us for current availability. Estimated lead time: 2-3 weeks.