Same-Day Shipping
Machrio
Steel Deep Groove Ball Bearing 1.38in Bore 3.15in OD for Industrial, Pkg Qty 8

Hover to zoom

Industrial · SKU: JU4679

Steel Deep Groove Ball Bearing 1.38in Bore 3.15in OD for Industrial, Pkg Qty 8

Engineered for demanding industrial applications, this steel deep groove ball bearing delivers reliable rotational support with minimal maintenance. Featuring a 1.38-inch bore diameter, 3.15-inch outside diameter, and 0.83-inch width, it ensures precise fitment within standard machinery housings. The robust steel construction provides high load capacity and resistance to wear, while the double metal shields offer effective contamination protection without compromising speed ratings. Ideal for electric motors, gearboxes, and conveyor systems, this component maintains operational integrity under continuous stress, supporting extended service life in heavy-duty environments.

Contact for Availability
$99.99
$12.50/each(8 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$99.99
11 - 50-5%$94.99
51+-10%$89.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

Bore Diameter1.38 in
Outside Diameter3.15 in
MaterialSteel
Inside Diameter1.38 in
Length0.83 in

Related Products

8 products

Frequently Asked Questions

What are the key specifications of Steel Deep Groove Ball Bearing 1.38in Bore 3.15in OD for Industrial, Pkg Qty 8?
Full specifications for Steel Deep Groove Ball Bearing 1.38in Bore 3.15in OD for Industrial, Pkg Qty 8 are listed in the specification table on this page. This product is in the Plain Bearings category.
What is the minimum order quantity and bulk pricing for Steel Deep Groove Ball Bearing 1.38in Bore 3.15in OD for Industrial, Pkg Qty 8?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for Steel Deep Groove Ball Bearing 1.38in Bore 3.15in OD for Industrial, Pkg Qty 8?
Contact us for current availability. Estimated lead time: 2-3 weeks.