Same-Day Shipping
Machrio
13W 6500K White Spiral CFL Bulb for Track Lighting, Pkg Qty 100

Hover to zoom

Industrial · SKU: AA2846374

13W 6500K White Spiral CFL Bulb for Track Lighting, Pkg Qty 100

Designed for commercial track lighting applications, this 13-watt spiral compact fluorescent lamp delivers crisp 6500K white light to enhance visibility in workspaces. The tri-phosphor technology ensures high color rendering and consistent lumen output throughout its extended operational life. Measuring approximately 4.5 inches in length with a standard E26 base, the bulb fits seamlessly into existing track fixtures without modification. Operating at standard 120V, each unit provides energy-efficient illumination equivalent to a 60-watt incandescent while generating minimal heat. Sold in bulk cases of 100, this solution optimizes maintenance schedules and reduces total cost of ownership for large-scale facilities.

Contact for Availability
$9.99
$0.10/each(100 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$9.99
11 - 50-5%$9.49
51+-10%$8.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

Wattage13W
Color Temperature6500K
Lumens800 lm
Voltage220V
Fixture TypeSpiral CFL
Track TypeNot Applicable
Beam SpreadOmnidirectional

Related Products

8 products

Frequently Asked Questions

What are the key specifications of 13W 6500K White Spiral CFL Bulb for Track Lighting, Pkg Qty 100?
Full specifications for 13W 6500K White Spiral CFL Bulb for Track Lighting, Pkg Qty 100 are listed in the specification table on this page. This product is in the Track Light Fixtures category.
What is the minimum order quantity and bulk pricing for 13W 6500K White Spiral CFL Bulb for Track Lighting, Pkg Qty 100?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for 13W 6500K White Spiral CFL Bulb for Track Lighting, Pkg Qty 100?
Contact us for current availability. Estimated lead time: 2-3 weeks.