Same-Day Shipping
Machrio
E27 Ceramic High-Temp Lamp Holder for Track Lighting, Pkg Qty 100

Hover to zoom

Industrial · SKU: AA5898783

E27 Ceramic High-Temp Lamp Holder for Track Lighting, Pkg Qty 100

Designed for demanding commercial track lighting applications, this E27 ceramic lamp holder delivers superior thermal resistance up to 450°F, ensuring safe operation with high-wattage halogen or LED sources. The robust porcelain construction provides excellent electrical insulation and long-term durability in high-heat environments. Featuring a standard E27 screw base compatible with fixtures up to 660W at 250V, this component guarantees reliable connectivity and simplified maintenance. Sold in bulk packs of 100 units, these holders offer a cost-effective solution for large-scale installations requiring consistent performance and adherence to rigorous safety standards.

Contact for Availability
$99.99
$1.00/each(100 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$99.99
11 - 50-5%$94.99
51+-10%$89.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

WattageNot Applicable
Color TemperatureNot Applicable
LumensNot Applicable
Voltage120V
Fixture TypeSocket
Track TypeNot Applicable
Beam SpreadNot Applicable

Related Products

8 products

Frequently Asked Questions

What are the key specifications of E27 Ceramic High-Temp Lamp Holder for Track Lighting, Pkg Qty 100?
Full specifications for E27 Ceramic High-Temp Lamp Holder for Track Lighting, Pkg Qty 100 are listed in the specification table on this page. This product is in the Track Light Fixtures category.
What is the minimum order quantity and bulk pricing for E27 Ceramic High-Temp Lamp Holder for Track Lighting, Pkg Qty 100?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for E27 Ceramic High-Temp Lamp Holder for Track Lighting, Pkg Qty 100?
Contact us for current availability. Estimated lead time: 2-3 weeks.