Same-Day Shipping
Machrio
E27 Full Thread Brass Lamp Holder for Track Lighting, Pkg Qty 36

Hover to zoom

Industrial · SKU: AE3305240

E27 Full Thread Brass Lamp Holder for Track Lighting, Pkg Qty 36

Designed for commercial track lighting systems, this E27 full-thread brass lamp holder delivers superior electrical conductivity and long-term durability. Constructed with a solid brass core, the unit withstands high-temperature environments up to 392°F while maintaining structural integrity under continuous operation. The precise full-thread design ensures a secure bulb connection, minimizing vibration risks in active retail or gallery settings. Each package contains 36 units, streamlined for efficient bulk installation and inventory management. Ideal for professionals requiring reliable, code-compliant components that support standard medium-base lamps without compromising performance or safety.

Contact for Availability
$79.99
$2.22/each(36 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$79.99
11 - 50-5%$75.99
51+-10%$71.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

WattageNot Applicable
Color TemperatureNot Applicable
LumensNot Applicable
Voltage120V
Fixture TypeSocket
Track TypeNot Applicable
Beam SpreadNot Applicable

Related Products

8 products

Frequently Asked Questions

What are the key specifications of E27 Full Thread Brass Lamp Holder for Track Lighting, Pkg Qty 36?
Full specifications for E27 Full Thread Brass Lamp Holder for Track Lighting, Pkg Qty 36 are listed in the specification table on this page. This product is in the Track Light Fixtures category.
What is the minimum order quantity and bulk pricing for E27 Full Thread Brass Lamp Holder for Track Lighting, Pkg Qty 36?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for E27 Full Thread Brass Lamp Holder for Track Lighting, Pkg Qty 36?
Contact us for current availability. Estimated lead time: 2-3 weeks.