Same-Day Shipping
Machrio
T8 LED Tube 4ft 18W 6500K Metal Base Double-End Wire Track Light, Pkg Qty 50

Hover to zoom

Industrial · SKU: AE5862614

T8 LED Tube 4ft 18W 6500K Metal Base Double-End Wire Track Light, Pkg Qty 50

This 4-foot T8 LED tube delivers 18 watts of high-efficiency illumination with a crisp 6500K daylight color temperature, ideal for commercial track lighting applications. Constructed with durable metal end caps and designed for double-end wiring, the fixture ensures stable electrical connectivity and extended operational life. The unit measures 48 inches in length and is individually packaged to prevent transit damage, with bulk quantities of 50 available for large-scale installations. Its robust design supports consistent performance in demanding environments while maintaining energy savings compared to traditional fluorescent alternatives.

Contact for Availability
$9.99
$0.20/each(50 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$9.99
11 - 50-5%$9.49
51+-10%$8.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

Wattage18W
Color Temperature6500K
Lumens1800 lm
Voltage220V
Fixture TypeLED Tube
Track TypeNot Applicable
Beam Spread120 deg

Related Products

8 products

Frequently Asked Questions

What are the key specifications of T8 LED Tube 4ft 18W 6500K Metal Base Double-End Wire Track Light, Pkg Qty 50?
Full specifications for T8 LED Tube 4ft 18W 6500K Metal Base Double-End Wire Track Light, Pkg Qty 50 are listed in the specification table on this page. This product is in the Track Light Fixtures category.
What is the minimum order quantity and bulk pricing for T8 LED Tube 4ft 18W 6500K Metal Base Double-End Wire Track Light, Pkg Qty 50?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for T8 LED Tube 4ft 18W 6500K Metal Base Double-End Wire Track Light, Pkg Qty 50?
Contact us for current availability. Estimated lead time: 2-3 weeks.