Same-Day Shipping
Machrio
T8 LED Vapor Tight Fixture 48in Dual Tube Steel Industrial, Pkg Qty 6

Hover to zoom

Industrial · SKU: AA3788987

T8 LED Vapor Tight Fixture 48in Dual Tube Steel Industrial, Pkg Qty 6

This industrial-grade vapor tight fixture features a robust steel housing designed for demanding environments, measuring 48 inches in length with a dual-tube T8 LED configuration. Each unit includes two 18-watt tubes, delivering high-efficiency illumination while maintaining an IP65-rated seal against dust and moisture. The assembly supports operating temperatures ranging from -4°F to 104°F, ensuring reliable performance in cold storage or humid facilities. Engineered for rapid installation, this 4-foot solution reduces maintenance costs and energy consumption compared to traditional fluorescent systems, making it ideal for warehouses, parking garages, and food processing plants.

Contact for Availability
$169.99
$28.33/each(6 pcs/pkg)

Volume Pricing - Buy More, Save More

QuantityDiscountUnit Price
1 - 10-$169.99
11 - 50-5%$161.49
51+-10%$152.99
Request Quote

Free Shipping $200+

On qualifying orders

Fast DDP Delivery

Door-to-door service

24/7 Support

Expert assistance

Technical Specifications

Wattage32W
Color TemperatureWhite Light
Lumens3200 lm
Voltage220V
Fixture TypeTri-proof Light
Track TypeNot Applicable
Beam Spread120 deg

Related Products

8 products

Frequently Asked Questions

What are the key specifications of T8 LED Vapor Tight Fixture 48in Dual Tube Steel Industrial, Pkg Qty 6?
Full specifications for T8 LED Vapor Tight Fixture 48in Dual Tube Steel Industrial, Pkg Qty 6 are listed in the specification table on this page. This product is in the Track Light Fixtures category.
What is the minimum order quantity and bulk pricing for T8 LED Vapor Tight Fixture 48in Dual Tube Steel Industrial, Pkg Qty 6?
The minimum order quantity is 1 unit(s).
What is the lead time and availability for T8 LED Vapor Tight Fixture 48in Dual Tube Steel Industrial, Pkg Qty 6?
Contact us for current availability. Estimated lead time: 2-3 weeks.